合布线工程信息点端口对应表应该在出场施工前结束,并且打印带到现场,便当现场施工编号。端口对应表是概括布线施工必需的技术文件,首要规矩房间编号,信息点编号,配线架编号,端口编号,机柜编号等,首要用于系统管理、施工便当和后续平时保护

(The information point port correspondence table of the combined wiring project should be completed before the construction on the site, and it should be printed and brought to the site for the convenience of the site construction number. The port correspondence table is a technical document that summarizes the necessary technical documents for wiring construction. The main rules are room number, information point number, patch panel number, port number, cabinet number, etc. It is mainly used for system management, construction convenience and subsequent maintenance.)